Turn-key project for clean room factory in China

Turn-key project for clean room factory in China

Best gmp clean room panels company supplier: Settling colony count and plankton determination requirements: at the same time of each experiment, count the settling colony of microorganisms in the operating room and laminar flow table, record the results in the user log, and record the original data of the experimental environment in the experiment report. Disinfection requirements: Every week and every operation in the sterile room, the operating table and the dead corners should be wiped with appropriate disinfectant. The specific method is to use sterile gauze impregnation disinfection solution to clean the entire inner surface of the super clean bench, and aseptic room, flow of people, logistics, buffer room floor, transfer window, door handle. Cleaning and disinfection procedures should be from the inside out, from high clean areas to low clean areas. Gradually exit the clean area. Then turn on the aseptic air filter and UV lamp for 1-2h sterilization to kill the remaining microorganisms. At the end of each operation, wipe the workbench with the above disinfection solution, remove indoor moisture, and sterilize with UV lamp for 30min. Discover additional details on clean room wall panels.

Air filter refers to the air filter device, which is generally used in clean workshop, clean workshop, laboratory and clean room, or used for dust prevention of electronic machinery communication equipment. There are primary filter, medium efficiency filter, high efficiency filter and sub high efficiency model. Different models have different standards and performance. The comprehensive performance test of clean room includes: Wind speed, air volume (ventilation frequency), temperature and relative humidity, suspended particle number, planktonic bacteria, settling bacteria, static pressure difference, illumination, noise, air flow pattern, self purification time, high-efficiency filter leak detection, total bacterial colonies in the air, total bacterial colonies on the surface of the worktable, total bacterial colonies on the surface of the worktable, total bacterial colonies on the surface of workers’ hands, etc.

Pharmaceutical equipment includes: granulating oven, boiling dryer, wet machine, pulverizer, vibrating screen, slicer, drug frying machine, drug frying machine, tablet press, pill making machine, multi-functional extraction tank, liquid storage tank, liquid distribution tank, decompression drying oven, tilting reaction pot, capsule filling machine, bubble type packaging machine, particle packaging machine, powder packaging machine, V-type mixer, lifting feeder, etc.

In summary, maintaining the right humidity level in clean rooms is vital for ensuring their effectiveness and longevity. By understanding the normal humidity range for clean rooms (between 40% and 60% RH) and implementing proper cleanroom humidity control techniques such as using a dehumidifier, hygrometer, proper ventilation, and controlling water sources, professionals can help create a controlled environment that promotes optimal performance and safety.

Mainly control the pollution of air dust particles and organisms (bacteria) to working objects, and maintain a negative pressure with the atmosphere inside. Pharma cleanroom project It is suitable for precision machinery industry, electronics industry, aerospace industry, high-purity chemical industry, atomic energy industry, optomagnetic product industry, LCD, computer hard disk; pharmaceutical industry, hospital, operating room, sterile ward, food, cosmetics, beverage products Animal laboratory, physical and chemical laboratory, blood station, etc. More cases check our cleanroom project page.

For the unidirectional flow (laminar flow) clean room, the air supply volume is determined by the product of the average wind speed of the room section and the cross-sectional area, in which the measured section of the vertical unidirectional flow (laminar flow) clean room is the horizontal section 0.8m away from the ground; The horizontal unidirectional flow (laminar flow) clean room takes a vertical section 0.5m away from the air supply surface. The spacing of measuring points on the section shall not be greater than 2m, and the number of measuring points shall not be less than 10, which shall be evenly arranged. Hot bulb anemometer for instrument.

Cleanroom pharma manufacturer and supplier in China: Today (Suzhou Pharma Machinery Co., Ltd.) will introduce to you, clean room airflow and influencing factors. There are many factors affecting the airflow in the clean room, such as process equipment, personnel, clean room assembly materials, lighting fixtures, etc. At the same time, the distribution point of airflow above the production equipment should also be considered.

Clean shed, also known as clean work shed (dust-free shed, purification shed, operating table, etc.), is a small space surrounded by anti-static mesh curtains or plexiglass in the clean room, and HEPA and FFU air supply units are used above. It is composed of a space with a higher purification level than the clean room, and the clean room can be equipped with purification equipment such as air shower room and transfer window.

A clean room is defined as a room with air filtration, distribution, optimization, construction materials and devices, where specific regular operating procedures are used to control airborne particulate concentrations to achieve an appropriate level of particulate cleanliness. A clean room refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow speed and airflow distribution, noise vibration and lighting, static electricity. A specially designed room that is controlled within a certain demand range. Find additional info on https://www.sz-pharma.com/.

Comments are closed